Saltar al contenido principal

ETHNOS_APP

Inicio • Búsqueda • Revistas • Lista 0

M J Perry

Datos Biográficos

ID6061012
NOMBREM J Perry
NOMBRESM J
APELLIDOPerry
FIRMAPERRY M J
AFILIACIONESEast Carolina University
VERIFICADONo
TOTAL DE OBRAS2
TOTAL DE CITAS0
OBRAS COMO AUTOR2
OBRAS COMO EDITOR0
PRIMER AÑO DE PUBLICACIÓN2025
AÑO MÁS RECIENTE DE PUBLICACIÓN2025
ÍNDICE H0
  • Utilizing 3D Building Information Modeling Approaches to Propose Modular Postdisruption Housing Designs

    Josey Wilson, Stavros Boardman et al.•ARTICLE•Natural Hazards Review•2025

    Disruptive events can cause mass population displacement that leads to decision-making dilemmas regarding homelessness, short-term versus long-term infrastructure investment, and resource use. This research uses building information modeling (BIM) approaches to provide solutions for postdisaster issues via implementation of general purpose (GP) shipping containers as a means of temporary housing units (THUs). The use of GP shipping containers for…

  • Using the critical path method (CPM) for evaluating allocation potential of temporary housing units

    Open Access•Daniel V Perrucci, John R U Wilson et al.•ARTICLE•Journal of Housing and the Built…•2025•Referencias: 1

    For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homele…

Sin obras prominentes en esta página.

  • Utilizing 3D Building Information Modeling Approaches to Propose Modular Postdisruption Housing Designs

    Josey Wilson, Stavros Boardman et al.•ARTICLE•Natural Hazards Review•2025

    Disruptive events can cause mass population displacement that leads to decision-making dilemmas regarding homelessness, short-term versus long-term infrastructure investment, and resource use. This research uses building information modeling (BIM) approaches to provide solutions for postdisaster issues via implementation of general purpose (GP) shipping containers as a means of temporary housing units (THUs). The use of GP shipping containers for…

  • Using the critical path method (CPM) for evaluating allocation potential of temporary housing units

    Open Access•Daniel V Perrucci, John R U Wilson et al.•ARTICLE•Journal of Housing and the Built…•2025•Referencias: 1

    For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homele…

Computer Science (2 obras) · Engineering (2 obras) · 3D Modeling in Geospatial Applications (1 obra) · Architectural engineering (1 obra) · BIM and Construction Integration (1 obra) · Building Information Modeling (1 obra) · Civil engineering (1 obra) · Construction engineering (1 obra) · Critical path method (1 obra) · Disaster Management and Resilience (1 obra)

Ethnos_APP • Proyecto Open Source • Licencia MIT • Frontend v2.0.0 • Privacidad y Cookies • Documentación de la API: api.ethnos.app/docs • Código de la API: GitHub • DOI: 10.5281/zenodo.17049435 • Código del Frontend: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae