Charles Doktycz
Datos Biográficos
| ID | 6772078 |
|---|---|
| NOMBRE | Charles Doktycz |
| NOMBRES | Charles |
| APELLIDO | Doktycz |
| FIRMA | DOKTYCZ C |
| AFILIACIONES | Nashville Oncology Associates |
| VERIFICADO | No |
| TOTAL DE OBRAS | 1 |
| TOTAL DE CITAS | 0 |
| OBRAS COMO AUTOR | 1 |
| OBRAS COMO EDITOR | 0 |
| PRIMER AÑO DE PUBLICACIÓN | 2025 |
| AÑO MÁS RECIENTE DE PUBLICACIÓN | 2025 |
| ÍNDICE H | 0 |
Using the critical path method (CPM) for evaluating allocation potential of temporary housing units
For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homele…
Sin obras prominentes en esta página.
Using the critical path method (CPM) for evaluating allocation potential of temporary housing units
For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homele…
Computer Science (1 obra) · Critical path method (1 obra) · Disaster Management and Resilience (1 obra) · Economic geography (1 obra) · Economics (1 obra) · Engineering (1 obra) · Facility Location and Emergency Management (1 obra) · Human geography (1 obra) · Path (computing (1 obra) · Systems engineering (1 obra)