Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Raymond E Levitt

Biographic Data

ID1212948
NAMERaymond E Levitt
GIVEN NAMESRaymond E
FAMILY NAMELevitt
SIGNATURELEVITT R E
AFFILIATIONSStanford University
ORCID0000-0001-8222-6967
VERIFIEDYes
TOTAL WORKS4
TOTAL CITATIONS46
WORKS AS AUTHOR4
WORKS AS EDITOR0
FIRST PUBLICATION YEAR1981
LATEST PUBLICATION YEAR2021
H-INDEX2
  • Using scripts to address cultural and institutional challenges of global project coordination

    Open Access•Catherine Durnell Cramton, Tine Köhler et al.•ARTICLE•Journal of International Business…•2021

  • One approach does not fit all (smart) cities

    Open Access•Robert Wilhelm Siegfried Ruhlandt, Raymond E Levitt et al.•ARTICLE•Cities•2020•Cited by: 6•References: 15

  • Site Fights”

    Open Access•Doug Mcadam, Hilary Boudet et al.•ARTICLE•Sociological Forum•2010•Cited by: 40•References: 22

    Fifty years ago, the main challenges to large infrastructure projects were technical or scientific. Today, the greatest hurdles faced by such projects are almost always social and/or political. Whether constructing large dams in the developing world or siting liquefied natural gas terminals in the United States, the onset of these projects often triggers intense popular opposition. But not always, and therein lays the animating aim of this projec…

  • Union and Open-Shop Construction

    Joseph B Rose, Clinton C Bourdon et al.•ARTICLE•Industrial and Labor Relations…•1981

  • Site Fights”

    Open Access•Doug Mcadam, Hilary Boudet et al.•ARTICLE•Sociological Forum•2010•Cited by: 40•References: 22

    Fifty years ago, the main challenges to large infrastructure projects were technical or scientific. Today, the greatest hurdles faced by such projects are almost always social and/or political. Whether constructing large dams in the developing world or siting liquefied natural gas terminals in the United States, the onset of these projects often triggers intense popular opposition. But not always, and therein lays the animating aim of this projec…

  • One approach does not fit all (smart) cities

    Open Access•Robert Wilhelm Siegfried Ruhlandt, Raymond E Levitt et al.•ARTICLE•Cities•2020•Cited by: 6•References: 15

  • Union and Open-Shop Construction

    Joseph B Rose, Clinton C Bourdon et al.•ARTICLE•Industrial and Labor Relations…•1981

  • Site Fights”

    Open Access•Doug Mcadam, Hilary Boudet et al.•ARTICLE•Sociological Forum•2010•Cited by: 40•References: 22

    Fifty years ago, the main challenges to large infrastructure projects were technical or scientific. Today, the greatest hurdles faced by such projects are almost always social and/or political. Whether constructing large dams in the developing world or siting liquefied natural gas terminals in the United States, the onset of these projects often triggers intense popular opposition. But not always, and therein lays the animating aim of this projec…

  • One approach does not fit all (smart) cities

    Open Access•Robert Wilhelm Siegfried Ruhlandt, Raymond E Levitt et al.•ARTICLE•Cities•2020•Cited by: 6•References: 15

  • Using scripts to address cultural and institutional challenges of global project coordination

    Open Access•Catherine Durnell Cramton, Tine Köhler et al.•ARTICLE•Journal of International Business…•2021

Computer Science (3 works) · Economics (2 works) · Qualitative comparative analysis (2 works) · Qualitative Comparative Analysis Research (2 works) · Sociology (2 works) · Advanced Manufacturing and Logistics Optimization (1 work) · Analytics (1 work) · Artificial Intelligence (1 work) · Artificial Intelligence (1 work) · Assembly Line Balancing Optimization (1 work)

Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae