Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Mohammed Abu Bakar Siddique

Biographic Data

ID1405575
NAMEMohammed Abu Bakar Siddique
GIVEN NAMESMohammed Abu Bakar
FAMILY NAMESiddique
SIGNATURESIDDIQUE M A B
AFFILIATIONSBangladesh University of Engineering and Technology
VERIFIEDNo
TOTAL WORKS1
TOTAL CITATIONS2
AUTHOR COUNT1
EDITOR COUNT0
FIRST PUBLICATION YEAR1995
LATEST PUBLICATION YEAR1995
H-INDEX1
  • Flood Control Projects in Bangladesh

    Open Access•M Mozzammel Hoque, Mohammed Abu Bakar Siddique•ARTICLE•Disasters•1995•Cited by: 2

    Flood control and drainage projects in Bangladesh are intended to give protection from main river floods, flash floods in the east and northeast of the country, and saline intrusion in the lower delta and to improve drainage in order to avoid crop damage. While in some cases such projects have had positive results, in many others their benefits have fallen well below expectations. One of the major reasons for the poor performance of projects is e…

  • Flood Control Projects in Bangladesh

    Open Access•M Mozzammel Hoque, Mohammed Abu Bakar Siddique•ARTICLE•Disasters•1995•Cited by: 2

    Flood control and drainage projects in Bangladesh are intended to give protection from main river floods, flash floods in the east and northeast of the country, and saline intrusion in the lower delta and to improve drainage in order to avoid crop damage. While in some cases such projects have had positive results, in many others their benefits have fallen well below expectations. One of the major reasons for the poor performance of projects is e…

  • Flood Control Projects in Bangladesh

    Open Access•M Mozzammel Hoque, Mohammed Abu Bakar Siddique•ARTICLE•Disasters•1995•Cited by: 2

    Flood control and drainage projects in Bangladesh are intended to give protection from main river floods, flash floods in the east and northeast of the country, and saline intrusion in the lower delta and to improve drainage in order to avoid crop damage. While in some cases such projects have had positive results, in many others their benefits have fallen well below expectations. One of the major reasons for the poor performance of projects is e…

Business (1 work) · Computer Science (1 work) · Control (management (1 work) · Drainage (1 work) · Engineering (1 work) · Environmental planning (1 work) · Flash flood (1 work) · Flood control (1 work) · Flood myth (1 work) · Flood Risk Assessment and Management (1 work)

Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae