M J Perry
Biographic Data
| ID | 6061012 |
|---|---|
| NAME | M J Perry |
| GIVEN NAMES | M J |
| FAMILY NAME | Perry |
| SIGNATURE | PERRY M J |
| AFFILIATIONS | East Carolina University |
| VERIFIED | No |
| TOTAL WORKS | 2 |
| TOTAL CITATIONS | 0 |
| WORKS AS AUTHOR | 2 |
| WORKS AS EDITOR | 0 |
| FIRST PUBLICATION YEAR | 2025 |
| LATEST PUBLICATION YEAR | 2025 |
| H-INDEX | 0 |
Utilizing 3D Building Information Modeling Approaches to Propose Modular Postdisruption Housing Designs
Disruptive events can cause mass population displacement that leads to decision-making dilemmas regarding homelessness, short-term versus long-term infrastructure investment, and resource use. This research uses building information modeling (BIM) approaches to provide solutions for postdisaster issues via implementation of general purpose (GP) shipping containers as a means of temporary housing units (THUs). The use of GP shipping containers for…
Using the critical path method (CPM) for evaluating allocation potential of temporary housing units
For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homele…
No prominent works on this page.
Utilizing 3D Building Information Modeling Approaches to Propose Modular Postdisruption Housing Designs
Disruptive events can cause mass population displacement that leads to decision-making dilemmas regarding homelessness, short-term versus long-term infrastructure investment, and resource use. This research uses building information modeling (BIM) approaches to provide solutions for postdisaster issues via implementation of general purpose (GP) shipping containers as a means of temporary housing units (THUs). The use of GP shipping containers for…
Using the critical path method (CPM) for evaluating allocation potential of temporary housing units
For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homele…
Computer Science (2 works) · Engineering (2 works) · 3D Modeling in Geospatial Applications (1 work) · Architectural engineering (1 work) · BIM and Construction Integration (1 work) · Building Information Modeling (1 work) · Civil engineering (1 work) · Construction engineering (1 work) · Critical path method (1 work) · Disaster Management and Resilience (1 work)