Barbara Scudder-Soucie
Biographic Data
| ID | 6068381 |
|---|---|
| NAME | Barbara Scudder-Soucie |
| GIVEN NAMES | Barbara |
| FAMILY NAME | Scudder-Soucie |
| SIGNATURE | SCUDDER-SOUCIE B |
| AFFILIATIONS | Guijing Wang, Caroline A. Macera, Tom Schmid, Michael Pratt, David Buchner, and Gregory Heath are with the Division of Nutrition and Physical Activity, Centers for Disease Control and Prevention, Atlanta, Ga. Barbara Scudder-Soucie is with the Physical Activity Program, Nebraska Health and Human Services System, Lincoln. |
| VERIFIED | No |
| TOTAL WORKS | 1 |
| TOTAL CITATIONS | 2 |
| AUTHOR COUNT | 1 |
| EDITOR COUNT | 0 |
| FIRST PUBLICATION YEAR | 2004 |
| LATEST PUBLICATION YEAR | 2004 |
| H-INDEX | 1 |
Cost Analysis of the Built Environment
We estimated the annual cost of bike and pedestrian trails in Lincoln, Neb, using construction and maintenance costs provided by the Department of Parks and Recreation of Nebraska. We obtained the number of users of 5 trails from a 1998 census report. The annual construction cost of each trail was calculated by using 3%, 5%, and 10% discount rates for a period of useful life of 10, 30, and 50 years. The average cost per mile and per user was calc…
Cost Analysis of the Built Environment
We estimated the annual cost of bike and pedestrian trails in Lincoln, Neb, using construction and maintenance costs provided by the Department of Parks and Recreation of Nebraska. We obtained the number of users of 5 trails from a 1998 census report. The annual construction cost of each trail was calculated by using 3%, 5%, and 10% discount rates for a period of useful life of 10, 30, and 50 years. The average cost per mile and per user was calc…
Cost Analysis of the Built Environment
We estimated the annual cost of bike and pedestrian trails in Lincoln, Neb, using construction and maintenance costs provided by the Department of Parks and Recreation of Nebraska. We obtained the number of users of 5 trails from a 1998 census report. The annual construction cost of each trail was calculated by using 3%, 5%, and 10% discount rates for a period of useful life of 10, 30, and 50 years. The average cost per mile and per user was calc…
Agricultural economics (1 works) · Amenity (1 works) · Business (1 works) · Cost estimate (1 works) · Cost–benefit analysis (1 works) · Demography (1 works) · Ecology (1 works) · Ecology (1 works) · Economics (1 works) · Engineering (1 works)