Mary Nicholls
Biographic Data
| ID | 6693104 |
|---|---|
| NAME | Mary Nicholls |
| GIVEN NAMES | Mary |
| FAMILY NAME | Nicholls |
| SIGNATURE | NICHOLLS M |
| VERIFIED | No |
| TOTAL WORKS | 2 |
| TOTAL CITATIONS | 0 |
| WORKS AS AUTHOR | 2 |
| WORKS AS EDITOR | 0 |
| FIRST PUBLICATION YEAR | 2008 |
| LATEST PUBLICATION YEAR | 2024 |
| H-INDEX | 0 |
Different Stories for Different People - Engagement with the Archaeology of HS2 Area North
The UK high-speed railway High Speed Two (HS2) will link London and the Midlands following the route of the 19th-century London and Birmingham Railway. After years of work, including the largest programme of historic environment investigation in the UK across a swathe of the landscape over a number of years, the construction stage is now in progress. The lead document for the delivery of the historic environment works is HS2's generic Written Sch…
Palaeoenvironmental Reconstruction from Sediments at West Quay Road, Southampton
This detailed study of a 13m deep borehole from West Quay Road, Southampton documents estuary evolution over the Holocene in a locality which has received little attention in the literature. The work was undertaken by the Museum of London Archaeology Service Geoarchaeology department. The sediment sequence along with evidence from pollen, plant macrofossils, diatoms, ostracods, snails and radiocarbon dating shows the gradual drowning of the valle…
No prominent works on this page.
Palaeoenvironmental Reconstruction from Sediments at West Quay Road, Southampton
This detailed study of a 13m deep borehole from West Quay Road, Southampton documents estuary evolution over the Holocene in a locality which has received little attention in the literature. The work was undertaken by the Museum of London Archaeology Service Geoarchaeology department. The sediment sequence along with evidence from pollen, plant macrofossils, diatoms, ostracods, snails and radiocarbon dating shows the gradual drowning of the valle…
Different Stories for Different People - Engagement with the Archaeology of HS2 Area North
The UK high-speed railway High Speed Two (HS2) will link London and the Midlands following the route of the 19th-century London and Birmingham Railway. After years of work, including the largest programme of historic environment investigation in the UK across a swathe of the landscape over a number of years, the construction stage is now in progress. The lead document for the delivery of the historic environment works is HS2's generic Written Sch…
Archaeology (2 works) · Archaeology and ancient environmental studies (1 work) · Coastal and Marine Dynamics (1 work) · Coastal wetland ecosystem dynamics (1 work) · Ecology (1 work) · Estuary (1 work) · Fluvial (1 work) · Geoarchaeology (1 work) · Geography (1 work) · Geology (1 work)