Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Mohammad Ichsan

Biographic Data

ID6801435
NAMEMohammad Ichsan
GIVEN NAMESMohammad
FAMILY NAMEIchsan
SIGNATUREICHSAN M
AFFILIATIONSBinus University
ORCID0000-0001-7221-5172
VERIFIEDYes
TOTAL WORKS4
TOTAL CITATIONS0
WORKS AS AUTHOR4
WORKS AS EDITOR0
FIRST PUBLICATION YEAR2024
LATEST PUBLICATION YEAR2024
H-INDEX0
  • Insights and challenges of sustainable project management implementations in construction sectors

    Open Access•Gery Prasetyo, Michael Efren Sutanto et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    The construction industry is a significant contributor towards global environmental degradation and resource depletion, with developing economies facing unique challenges in adopting sustainable construction practices. This systematic review aims to investigate the gap in sustainable construction implementation among global counterparts. The study utilizes the P5 (People, Planet, Prosperity, Process, Products) Standard as a framework for evaluati…

  • Optimization of completion schedule forecasting in case study of double-double track development project (Package A) using the probabilistic pert method

    Open Access•Leni Sagita Riantini, Mohammad Ichsan et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study reve…

  • Achieving successful gas plant construction

    Open Access•Wisnu Isvara, Mohammad Ichsan et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    The construction of gas plants often experiences delays caused by various factors, which can lead to significant financial and operational losses. This research aims to develop an accurate risk model to improve the schedule performance of gas plant projects. The model uses Quantitative Risk Analysis (QRA) and Monte Carlo simulation methods to identify and measure the risks that most significantly impact project schedule performance. A comprehensi…

  • Sustainable Construction Project Management – A Proposed Conceptual Framework from Systematic Literature Review

    Open Access•Suwarno Suwarno, Diena Dwidienawati et al.•ARTICLE•Evolutionary Studies in…•2024

    The construction industry is estimated to contribute to huge stimulation to improve health, economy, and poverty with investment globally up to US$94 trillion by 2040. However, at the same time construction industry is also a huge risk to sustainability, where most of the activities are performed in form of projects. It causes an incredible threat to the environment and community, which leads to the new concept of sustainable project management. …

No prominent works on this page.

  • Insights and challenges of sustainable project management implementations in construction sectors

    Open Access•Gery Prasetyo, Michael Efren Sutanto et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    The construction industry is a significant contributor towards global environmental degradation and resource depletion, with developing economies facing unique challenges in adopting sustainable construction practices. This systematic review aims to investigate the gap in sustainable construction implementation among global counterparts. The study utilizes the P5 (People, Planet, Prosperity, Process, Products) Standard as a framework for evaluati…

  • Optimization of completion schedule forecasting in case study of double-double track development project (Package A) using the probabilistic pert method

    Open Access•Leni Sagita Riantini, Mohammad Ichsan et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study reve…

  • Achieving successful gas plant construction

    Open Access•Wisnu Isvara, Mohammad Ichsan et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    The construction of gas plants often experiences delays caused by various factors, which can lead to significant financial and operational losses. This research aims to develop an accurate risk model to improve the schedule performance of gas plant projects. The model uses Quantitative Risk Analysis (QRA) and Monte Carlo simulation methods to identify and measure the risks that most significantly impact project schedule performance. A comprehensi…

  • Sustainable Construction Project Management – A Proposed Conceptual Framework from Systematic Literature Review

    Open Access•Suwarno Suwarno, Diena Dwidienawati et al.•ARTICLE•Evolutionary Studies in…•2024

    The construction industry is estimated to contribute to huge stimulation to improve health, economy, and poverty with investment globally up to US$94 trillion by 2040. However, at the same time construction industry is also a huge risk to sustainability, where most of the activities are performed in form of projects. It causes an incredible threat to the environment and community, which leads to the new concept of sustainable project management. …

Engineering (4 works) · Business (3 works) · Computer Science (3 works) · Construction Project Management and Performance (2 works) · Environmental planning (2 works) · Environmental resource management (2 works) · Operations research (2 works) · Process management (2 works) · Schedule (2 works) · Artificial Intelligence (1 work)

Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae