Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Louis J Mihalyi

Biographic Data

ID682765
NAMELouis J Mihalyi
GIVEN NAMESLouis J
FAMILY NAMEMihalyi
SIGNATUREMIHALYI L J
VERIFIEDNo
TOTAL WORKS3
TOTAL CITATIONS5
AUTHOR COUNT3
EDITOR COUNT0
FIRST PUBLICATION YEAR1973
LATEST PUBLICATION YEAR1982
H-INDEX2
  • Aggression, Bravery, Endurance, and Drugs

    Open Access•Arthur C Lehmann, Louis J Mihalyi•ARTICLE•Ethnology•1982•Cited by: 2

  • Electricity and Electrification for Zambia

    Open Access•Louis J Mihalyi•ARTICLE•Geographical Review•1977•Cited by: 3

    T HE modern development of Zambia began early in the twentieth century, when the first copper mine was opened. Until after World War II, the relatively small energy requirement of the country was supplied largely by thermal power plants which were fired with wood or imported coal. With the rapid expansion of copper mining since the 1950's, the decision was made to depend largely on the development of the hydroelectric potential to supply the need…

  • Zambia in maps

    Open Access•Louis J Mihalyi, John R Giardino•ARTICLE•Geoforum•1973

  • Electricity and Electrification for Zambia

    Open Access•Louis J Mihalyi•ARTICLE•Geographical Review•1977•Cited by: 3

    T HE modern development of Zambia began early in the twentieth century, when the first copper mine was opened. Until after World War II, the relatively small energy requirement of the country was supplied largely by thermal power plants which were fired with wood or imported coal. With the rapid expansion of copper mining since the 1950's, the decision was made to depend largely on the development of the hydroelectric potential to supply the need…

  • Aggression, Bravery, Endurance, and Drugs

    Open Access•Arthur C Lehmann, Louis J Mihalyi•ARTICLE•Ethnology•1982•Cited by: 2

  • Zambia in maps

    Open Access•Louis J Mihalyi, John R Giardino•ARTICLE•Geoforum•1973

  • Electricity and Electrification for Zambia

    Open Access•Louis J Mihalyi•ARTICLE•Geographical Review•1977•Cited by: 3

    T HE modern development of Zambia began early in the twentieth century, when the first copper mine was opened. Until after World War II, the relatively small energy requirement of the country was supplied largely by thermal power plants which were fired with wood or imported coal. With the rapid expansion of copper mining since the 1950's, the decision was made to depend largely on the development of the hydroelectric potential to supply the need…

  • Aggression, Bravery, Endurance, and Drugs

    Open Access•Arthur C Lehmann, Louis J Mihalyi•ARTICLE•Ethnology•1982•Cited by: 2

Geography (2 works) · Aggression (1 works) · Ancient history (1 works) · Archaeology (1 works) · Business (1 works) · Developmental psychology (1 works) · Economics (1 works) · Electrical engineering (1 works) · Electricity (1 works) · Electrification (1 works)

Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae