Jinbao Sheng
Biographic Data
| ID | 7893306 |
|---|---|
| NAME | Jinbao Sheng |
| GIVEN NAMES | Jinbao |
| FAMILY NAME | Sheng |
| SIGNATURE | SHENG J |
| AFFILIATIONS | Nanjing Hydraulic Research Institute |
| ORCID | 0000-0003-3539-5340 |
| VERIFIED | Yes |
| TOTAL WORKS | 3 |
| TOTAL CITATIONS | 0 |
| WORKS AS AUTHOR | 3 |
| WORKS AS EDITOR | 0 |
| FIRST PUBLICATION YEAR | 2011 |
| LATEST PUBLICATION YEAR | 2024 |
| H-INDEX | 0 |
Dynamic planning method of evacuation route in dam-break flood scenario based on the ACO-GA hybrid algorithm
Numerical Modeling of Overtopping-Induced Breach of Landslide Dams
Landslide dams have a high risk of overtopping failure compared to that of artificial dams. In this study, based on dam morphological characteristics, field investigations, and model tests, a numerical calculation method for overtopping-induced landslide dam breach is proposed. Highlights of the method include consideration of surface erosion rather than headcut erosion as well as a wide variety of dam deposits used to simulate the dam breach pro…
Spatial Multicriteria Decision Analysis of Flood Risks in Aging-Dam Management in China
Approximately 30,000 dams in China are aging and are considered to be high-level risks. Developing a framework for analyzing spatial multicriteria flood risk is crucial to ranking management scenarios for these dams, especially in densely populated areas. Based on the theories of spatial multicriteria decision analysis, this report generalizes a framework consisting of scenario definition, problem structuring, criteria construction, spatial quant…
No prominent works on this page.
Spatial Multicriteria Decision Analysis of Flood Risks in Aging-Dam Management in China
Approximately 30,000 dams in China are aging and are considered to be high-level risks. Developing a framework for analyzing spatial multicriteria flood risk is crucial to ranking management scenarios for these dams, especially in densely populated areas. Based on the theories of spatial multicriteria decision analysis, this report generalizes a framework consisting of scenario definition, problem structuring, criteria construction, spatial quant…
Numerical Modeling of Overtopping-Induced Breach of Landslide Dams
Landslide dams have a high risk of overtopping failure compared to that of artificial dams. In this study, based on dam morphological characteristics, field investigations, and model tests, a numerical calculation method for overtopping-induced landslide dam breach is proposed. Highlights of the method include consideration of surface erosion rather than headcut erosion as well as a wide variety of dam deposits used to simulate the dam breach pro…
Dynamic planning method of evacuation route in dam-break flood scenario based on the ACO-GA hybrid algorithm
Computer Science (2 works) · Engineering (2 works) · Flood myth (2 works) · Flood Risk Assessment and Management (2 works) · Mathematics (2 works) · Algorithm (1 work) · Ant colony optimization algorithms (1 work) · Artificial Intelligence (1 work) · Business (1 work) · Dam Engineering and Safety (1 work)