Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Ayomi Dita Rarasati

Biographic Data

ID8081568
NAMEAyomi Dita Rarasati
GIVEN NAMESAyomi Dita
FAMILY NAMERarasati
SIGNATURERARASATI A D
AFFILIATIONSUniversity of Indonesia
ORCID0000-0002-7272-461X
VERIFIEDYes
TOTAL WORKS4
TOTAL CITATIONS0
WORKS AS AUTHOR4
WORKS AS EDITOR0
FIRST PUBLICATION YEAR2024
LATEST PUBLICATION YEAR2024
H-INDEX0
  • Policy development of road plus property developer on toll road with SOE assignment schemes

    Open Access•Remi Fitriadi Kurnia, Agia Rachmadi Purwadita et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    The Trans Sumatra Toll Road (TSTR) is a mega toll road project with an assignment State-Owned Enterprise (SOE) scheme in Indonesia. In its development, TSTR has several limitations, including funding, low investment feasibility and the un-optimum implementation of land value capture (LVC). This has the impact of delaying the completion of project development, decreasing the performance of toll road developer companies and even causing bankruptcy.…

  • Optimization of completion schedule forecasting in case study of double-double track development project (Package A) using the probabilistic pert method

    Open Access•Leni Sagita Riantini, Mohammad Ichsan et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study reve…

  • Investigating knowledge management contribution to dispute minimization of airport development projects in Indonesia

    Open Access•Ayomi Dita Rarasati, Ayu Erlinda•ARTICLE•Journal of Infrastructure Policy…•2024

    Most airport development projects entail disputes due to the features that are distinctive and complicated. Disputes can be minimized through creative problem-solving by implementing knowledge management practices into the system. This study investigates the direct influence of knowledge management (KM) on dispute minimization (DM) along with the key factors for developing a strategy that can enhance KM success. A mixed method was adopted includi…

  • Increasing the cost accuracy of implementing green retrofitting in high-rise office buildings

    Open Access•Bernadette Detty Kussumardianadewi, Yusuf Latief et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    Implementing green retrofitting can save 50–90% of energy use in buildings built worldwide. Government policies in several developed countries have begun to increase the implementation of green retrofitting buildings in those countries, which must rise by up to 2.5% of the lifespan of buildings by 2030. By 2050, it is hoped that more than 85% of all buildings will have been retrofitted. The high costs of implementing green retrofitting amounting …

No prominent works on this page.

  • Policy development of road plus property developer on toll road with SOE assignment schemes

    Open Access•Remi Fitriadi Kurnia, Agia Rachmadi Purwadita et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    The Trans Sumatra Toll Road (TSTR) is a mega toll road project with an assignment State-Owned Enterprise (SOE) scheme in Indonesia. In its development, TSTR has several limitations, including funding, low investment feasibility and the un-optimum implementation of land value capture (LVC). This has the impact of delaying the completion of project development, decreasing the performance of toll road developer companies and even causing bankruptcy.…

  • Optimization of completion schedule forecasting in case study of double-double track development project (Package A) using the probabilistic pert method

    Open Access•Leni Sagita Riantini, Mohammad Ichsan et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study reve…

  • Investigating knowledge management contribution to dispute minimization of airport development projects in Indonesia

    Open Access•Ayomi Dita Rarasati, Ayu Erlinda•ARTICLE•Journal of Infrastructure Policy…•2024

    Most airport development projects entail disputes due to the features that are distinctive and complicated. Disputes can be minimized through creative problem-solving by implementing knowledge management practices into the system. This study investigates the direct influence of knowledge management (KM) on dispute minimization (DM) along with the key factors for developing a strategy that can enhance KM success. A mixed method was adopted includi…

  • Increasing the cost accuracy of implementing green retrofitting in high-rise office buildings

    Open Access•Bernadette Detty Kussumardianadewi, Yusuf Latief et al.•ARTICLE•Journal of Infrastructure Policy…•2024

    Implementing green retrofitting can save 50–90% of energy use in buildings built worldwide. Government policies in several developed countries have begun to increase the implementation of green retrofitting buildings in those countries, which must rise by up to 2.5% of the lifespan of buildings by 2030. By 2050, it is hoped that more than 85% of all buildings will have been retrofitted. The high costs of implementing green retrofitting amounting …

Computer Science (3 works) · Engineering (3 works) · Business (2 works) · Process management (2 works) · Transport engineering (2 works) · Architectural engineering (1 work) · Artificial Intelligence (1 work) · BIM and Construction Integration (1 work) · Civil engineering (1 work) · Construction Project Management and Performance (1 work)

Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae