Wooyong Jung
Biographic Data
| ID | 8842256 |
|---|---|
| NAME | Wooyong Jung |
| GIVEN NAMES | Wooyong |
| FAMILY NAME | Jung |
| SIGNATURE | JUNG W |
| AFFILIATIONS | Department of Nuclear Power Plant Engineering KEPCO International Nuclear Graduate School Ulsan Korea |
| ORCID | 0000-0003-1954-9450 |
| VERIFIED | Yes |
| TOTAL WORKS | 2 |
| TOTAL CITATIONS | 0 |
| WORKS AS AUTHOR | 2 |
| WORKS AS EDITOR | 0 |
| FIRST PUBLICATION YEAR | 2019 |
| LATEST PUBLICATION YEAR | 2026 |
| H-INDEX | 0 |
Risk Manageability for Sustainable Public–Private Partnerships Development
Many Public–Private Partnership (PPP) projects fail in early development because risks are often assessed as static constraints rather than conditions that can be actively reduced through stakeholder action. This study introduces risk manageability as the capacity of stakeholders to actively shape and reduce risk exposure between the Project Selection Phase and the Bid and Proposal Phase. Drawing on 25 international PPP projects, we evaluate 27 r…
Who Remains Conservative
This study investigated the logic behind the formation process of political orientation in Korea by revisiting Thorstein Veblen s social Darwinism perspective, according to which the highest and lowest income groups keep their conservativeness longer than other groups either willingly or passively. In order to prove his theory, this study borrowed a dataset from the World Values Survey (WVS) and applied several regression models. As a result, con…
No prominent works on this page.
Who Remains Conservative
This study investigated the logic behind the formation process of political orientation in Korea by revisiting Thorstein Veblen s social Darwinism perspective, according to which the highest and lowest income groups keep their conservativeness longer than other groups either willingly or passively. In order to prove his theory, this study borrowed a dataset from the World Values Survey (WVS) and applied several regression models. As a result, con…
Risk Manageability for Sustainable Public–Private Partnerships Development
Many Public–Private Partnership (PPP) projects fail in early development because risks are often assessed as static constraints rather than conditions that can be actively reduced through stakeholder action. This study introduces risk manageability as the capacity of stakeholders to actively shape and reduce risk exposure between the Project Selection Phase and the Bid and Proposal Phase. Drawing on 25 international PPP projects, we evaluate 27 r…
Biology and political orientation (1 work) · Computational and Text Analysis Methods (1 work) · Construction Project Management and Performance (1 work) · Demographic economics (1 work) · Diverse Topics in Contemporary Research (1 work) · Economics (1 work) · General partnership (1 work) · Healthcare Facilities Design and Sustainability (1 work) · Law (1 work) · Neoclassical economics (1 work)