Satria Astana
Biographic Data
| ID | 9058606 |
|---|---|
| NAME | Satria Astana |
| GIVEN NAMES | Satria |
| FAMILY NAME | Astana |
| SIGNATURE | ASTANA S |
| AFFILIATIONS | Gatot Soebroto Army Hospital |
| VERIFIED | No |
| TOTAL WORKS | 2 |
| TOTAL CITATIONS | 0 |
| WORKS AS AUTHOR | 2 |
| WORKS AS EDITOR | 0 |
| FIRST PUBLICATION YEAR | 2020 |
| LATEST PUBLICATION YEAR | 2025 |
| H-INDEX | 0 |
An integrated spatial-dynamic model for sustainable biomass supply to coal-fired power plants
This study examines the economic feasibility of utilizing energy plantation forests (EPFs) to supply biomass for co-firing in a coal-fired power plant in Sukabumi Regency, West Java, Indonesia. A system dynamics model was developed to integrate the costs of establishing and harvesting EPFs, biomass transportation logistics, and wood processing into sawdust. It is noted that logistical challenges, including optimizing transportation routes and mod…
Towards improved forestry performance
Indonesia is a main tropical timber-producing country and is a leader in implementing Forest Law Enforcement, Governance and Trade Voluntary Partnership Agreements (FLEGT-VPA) with the European Union (EU). In 2015, as a part of the FLEGT-VPA process, the government began a timber legality assurance system called Sistem Verifikasi Legalitas Kayu (SVLK), which is mandatory for all timber product businesses. Since November 2016, Indonesia has issued…
No prominent works on this page.
Towards improved forestry performance
Indonesia is a main tropical timber-producing country and is a leader in implementing Forest Law Enforcement, Governance and Trade Voluntary Partnership Agreements (FLEGT-VPA) with the European Union (EU). In 2015, as a part of the FLEGT-VPA process, the government began a timber legality assurance system called Sistem Verifikasi Legalitas Kayu (SVLK), which is mandatory for all timber product businesses. Since November 2016, Indonesia has issued…
An integrated spatial-dynamic model for sustainable biomass supply to coal-fired power plants
This study examines the economic feasibility of utilizing energy plantation forests (EPFs) to supply biomass for co-firing in a coal-fired power plant in Sukabumi Regency, West Java, Indonesia. A system dynamics model was developed to integrate the costs of establishing and harvesting EPFs, biomass transportation logistics, and wood processing into sawdust. It is noted that logistical challenges, including optimizing transportation routes and mod…
Added value (1 work) · Agricultural engineering (1 work) · Bioenergy crop production and management (1 work) · Business (1 work) · Coal (1 work) · Coal fired (1 work) · Conservation, Biodiversity, and Resource Management (1 work) · Corporate governance (1 work) · Electrical engineering (1 work) · Enforcement (1 work)