Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration

Bibliographic Data

ID15466951
AuthorsYanbo Ma (0000-0002-4737-3352, Shandong University of Finance and Economics), Kaiyue Liu (0000-0003-4586-6628, Shandong University of Finance and Economics), Zheng Li (0000-0002-7537-2509, Shandong University of Finance and Economics), Xiang Chen (0000-0002-5045-9253, Qilu Hospital of Shandong University, corresponding author)
Year2022
Volume19
Issue20
Pages13685-13685
Publication date2022-10-21
Peer ReviewedYes
Open AccessYes
TypeARTICLE
VenueInternational Journal of Environmental Research and Public Health (JOURNAL)
Journal identifiersISSN: 1661-7827 • E-ISSN: 1660-4601
PublisherMultidisciplinary Digital Publishing Institute (PUBLISHER • CH)
DOI10.3390/ijerph192013685
PMID36294285
OpenAlexW4307262850
LanguageEN
References cited31

This paper proposes an operating room (OR) scheduling model to assign a group of next-day patients to ORs while adhering to OR availability, priorities, and OR overtime constraints. Existing studies usually consider OR scheduling problems by ignoring the influence of uncertainties in surgery durations on the OR assignment. In this paper, we address this issue by formulating accurate patient waiting times as the cumulative sum of uncertain surgery durations from the robust discrete approach point of view. Specifically, by considering the patients' uncertain surgery duration, we formulate the robust OR scheduling model to minimize the sum of the fixed OR opening cost, the patient waiting penalty cost, and the OR overtime cost. Then, we adopt the box uncertainty set to specify the uncertain surgery duration, and a robustness coefficient is introduced to control the robustness of the model. This resulting robust model is essentially intractable in its original form because there are uncertain variables in both the objective function and constraint. To make this model solvable, we then transform it into a Mixed Integer Linear Programming (MILP) model by employing the robust discrete optimization theory and the strong dual theory. Moreover, to evaluate the reliability of the robust OR scheduling model under different robustness coefficients, we theoretically analyze the constraint violation probability associated with overtime constraints. Finally, an in-depth numerical analysis is conducted to verify the proposed model's effectiveness and to evaluate the robustness coefficient's impact on the model performance. Our analytical results indicate the following: (1) With the robustness coefficient, we obtain the tradeoff relationship between the total management cost and the constraint violation probability, i.e., a smaller robustness coefficient yields remarkably lower total management cost at the expense of a noticeably higher constraint violation probability and vice versa. (2) The obtained total management cost is sensitive to small robustness coefficient values, but it hardly changes as the robustness coefficient increases to a specific value. (3) The obtained total management cost becomes increasingly sensitive to the perturbation factor with the decrease in constraint violation probability

Integer programming · Linear programming · Mathematical optimization · Robust optimization · Robustness (evolution · Scheduling (production processes · Computer Science · Healthcare Operations and Scheduling Optimization · Hospital Admissions and Outcomes · Mathematics · Risk and Portfolio Optimization

Citation velocityhistorical
Highly citedNo

Tools

Open DOIOpen Access
Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae