Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Follow-up of the Post-seismic reconstruction in Le Teil from the November 11th 2019 seismic event to now

Insights and zoom over building rehabilitation

Bibliographic Data

ID22025909
AuthorsC Negulescu (0000-0002-6222-5411, Bureau de Recherches Géologiques et Minières, corresponding author), J Vieille (Bureau de Recherches Géologiques et Minières), Pierre Gehl (0000-0002-1225-9621, Bureau de Recherches Géologiques et Minières), Nicolas Taillefer (Bureau de Recherches Géologiques et Minières), K Trevlopoulos (0000-0003-2079-8163, Bureau de Recherches Géologiques et Minières), Samuel Auclair (0000-0003-3490-668X, Bureau de Recherches Géologiques et Minières)
Year2025
Volume122
Pages105438
Publication date2025-05-01
Open AccessYes
TypeARTICLE
VenueInternational Journal of Disaster Risk Reduction (JOURNAL)
Journal identifiersISSN: 2212-4209
PublisherElsevier BV (PUBLISHER)
DOI10.1016/j.ijdrr.2025.105438
OpenAlexW4409152638
LanguageEN
Citations received1
References cited20

The magnitude Mw 4.9 earthquake of November 11, 2019 strongly affected the municipality of Le Teil, Rhone Valley, France. A quarter of around 2,800 exposed buildings were damaged, which led to safety evacuation orders. BRGM, the French Geological Survey, was commissioned by the French Ministry of Ecological Transition and Territorial Cohesion to collect quantitative data about the progress of the reconstruction. This work focuses on field monitoring of certain resilience parameters, such as the time for reconstruction and repairs. On the basis of emergency post-earthquake building safety inspections done by the French Association for Earthquake Engineering (AFPS), the reconstruction of buildings in the municipality of Le Teil is studied at different scales: building, infra-communal and communal. Interpreting damage observations and modelling reconstruction requires multiple sources of information, hence the importance of having data at these three different scales. Based on their reference state in the damaged buildings database, and in order to assess the progress of the reconstruction, the buildings are assigned a reconstruction stage based on annual visual inspections conducted from street level. In addition, a set of indicators has been employed to provide quantitative information evolving over time, such as the number of evacuation orders (issued and lifted) or the number of buildings whose reconstruction process has begun. Moreover, this study includes a detailed classification of the buildings, estimations for their vulnerability and predictive risk scenario calculations depending on assumptions about the level of structural reinforcement. These elements raise important questions about the reconstruction, particularly from the point of view of design standards. Finally, we highlight the importance of physical vulnerability and recovery capacities, two main components of the reconstruction process. This work constitutes a pioneering effort in terms of collecting records and observations of post-earthquake reconstruction in France, over a multi-year timespan

Forensic engineering · Physics · Seismology · Zoom · earthquake and tectonic studies · Engineering · Masonry and Concrete Structural Analysis · Psychology · Seismic Performance and Analysis · Geology · Paleontology · Rehabilitation

  • Evolution of earthquake crisis management and recovery in Italy after 2009

    Open Access•K Trevlopoulos, Christian Iasio et al.•International Journal of Disaster…•2026

  • Strengthening resilience in reconstruction after extreme events – Insights from flood affected communities in Germany

    Open Access•Jörn Birkmann, Holger Schüttrumpf et al.•International Journal of Disaster…•2023

  • The time process of post‐earthquake recovery

    Open Access•Ying Wang, Juan Li et al.•Disasters•2014

Citations per year1
Citation span2026 - 2026 (1)
Highly citedNo

Tools

Open DOIOpen Access
Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae