Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

Cost and Economics of Maintenance of Turbine Runner Cavitation

Bibliographic Data

ID22919201
AuthorsHarold G Hunt (Cons. Engr., East Aurora, N. Y.), Harold Hunt (Consol Energy (United States), corresponding author)
Year1966
Volume92
Issue1
Pages107-114
Publication date1966-01-01
Open AccessNo
TypeARTICLE
VenuePower (JOURNAL)
Journal identifiersISSN: 0569-8030 • E-ISSN: 1936-7791
PublisherAmerican Society of Civil Engineers (ASCE) (PUBLISHER • US)
DOI10.1061/jpweam.0000484
OpenAlexW2221605152
LanguageEN

Five, single unit, 20,000-kw hydroelectric power plants, built with turbine settings as specified by the manufacturer have runner cavitation or pitting repair problems in a short time when operated as peak load plants. The methods, procedures, materials, timing, and cost of in-place welding repairs are described and given for the initial maintenance up-keep of all plants. Cost records and an analysis of peak capacity operation show that the value of extra power far exceeds the increased cost of runner maintenance.

Cavitation · Electrical engineering · Geotechnical engineering · Hydraulic turbines · Hydro power · Hydroelectricity · Marine engineering · Operations management · Power (physics) · Reliability engineering · Turbine · Unit cost · Welding · Cavitation Phenomena in Pumps · Engineering · Mechanical Engineering · Non-Destructive Testing Techniques · Oil and Gas Production Techniques

Highly citedNo

Tools

Open DOI
Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae