The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a Covid-19 Epidemic Era

Bibliographic Data

ID3520901
AuthorsTemitope Seun Omotayo (0000-0001-5280-3946, Leeds Beckett University, corresponding author), Bankole Awuzie (0000-0003-3371-191X, Central University of Technology), Valerie Kenechukwu Obi (BAM Nuttall, Leeds, UK), Valerie Kenechukwu (BAM Nuttall (United Kingdom)), Saheed Ajayi (0000-0001-6630-0717, Leeds Beckett University), Lovelin Ifeoma Obi, Lovelin Obi (0000-0003-0325-0091, University of Wolverhampton), Oluyomi Osobajo, Oluyomi Abayomi Osobajo (0000-0003-4973-9079, Robert Gordon University), Adekunle Oke (0000-0002-5388-6170, Robert Gordon University)
Year2022
Volume12
Issue2
Publication date2022-04-01
Peer ReviewedYes
Open AccessYes
TypeARTICLE
VenueSAGE Open (JOURNAL)
Journal identifiersISSN: 2158-2440 • E-ISSN: 2158-2440
PublisherSAGE Publications Inc (PUBLISHER)
DOI10.1177/21582440221097923
OpenAlexW4281257516
LanguageEN
Citations received1
References cited26

Cost overrun is a global issue plaguing transportation infrastructure projects, and the rail industry in the United Kingdom is not exempted. This industry plays a significant role in stimulating the country's economic development and growth in the United Kingdom (UK). Understanding the factors contributing to cost overruns in rail projects is viable to sustain its contribution, especially in the COVID-19 epidemic era. This study analyzed and predicted the impact of cost overruns on rail projects in the UK in a COVID-19 pandemic era through a sparse network and system dynamics approach. It leverages a review of existing literature and perceptions of 80 construction professionals purposively to establish the factors affecting cost overruns affecting the UK rail construction sector. Findings reveal a web of causations that highlights labor productivity, delay in the supply of construction materials and equipment, and access to the site as fundamental predictors of cost overruns during a COVID-19 pandemic era. The resulting findings are beneficial to assist project managers with the needed awareness to strategically plan and mitigate the potential rise in cost overruns of rail projects in the UK during the pandemic

Business · Construction industry · Cost overrun · Economic growth · Economics · Geography · Pandemic · Productivity · Transport engineering · Construction Project Management and Performance · Engineering · Occupational Health and Safety Research · Transport and Economic Policies

  • Systems Thinking Interplay Between Project Complexities, Stakeholder Engagement, and Social Dynamics Roles in Influencing Construction Project Outcomes

    Open Access•Temitope Seun Omotayo, Jonathan Ross et al.•SAGE Open•2024

  • Cronbach’s α , Revelle’s β , and Mcdonald’s ω H

    Open Access•Richard E Zinbarg, William Revelle et al.•Psychometrika•2005

  • Sustainability rating system for highway design

    Open Access•Ikechukwu Uchehara, David Moore et al.•Sustainable Cities and Society•2022

Unique citing works1
Citations per year0,5
Citation span2024 - 2024 (1)
Citation velocityrecent
Highly citedNo
Citation typesNeutral: 1

Tools

Open DOIOpen Access
Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae