Análise do tempo de tramitação de processos de licenciamento ambiental
Estudo de casos de termelétricas no Estado de São Paulo
Bibliographic Data
| ID | 5804500 |
|---|---|
| Authors | Graziela De Toni Aguilar (Universidade Federal de São Carlos, corresponding author) |
| Year | 2008 |
| Publication date | 2008-07-14 |
| Open Access | Yes |
| Type | THESIS |
| Publisher | Universidade de São Paulo. Agência de Bibliotecas e Coleções Digitais (PUBLISHER) |
| DOI | 10.11606/d.18.2008.tde-18112008-155735 |
| OpenAlex | W1907357851 |
| Language | PT |
| Citations received | 2 |
| References cited | 1 |
The procedures for environmental licensing (LA) have been criticized by economic agents, especially by those connected to the energy sector, because they believe that agility on analysis of the processes of enterprises environmental viability is less than what was expected.In order to analyze the interference of some factors related to LA proceedings on proceeding period, the processes documentary review was held and transited in São Paulo State between 1998 and 2007 for the installation of natural gas thermal power plants with emitted preliminary environmental permit (LP) and output exceeding 10 MW.Quantitative data and qualitative information were obtained which allowed the confirmation that the factors "number of requests for additional information made by environmental agencies to the enterprise", "number of environmental impacts identified in the Environmental Impact Statement (EIA)" and "number of constraints in the LP emitted" have no relation to the proceeding period.Other factors such as shortcomings in the environmental study and inadequate the proposed site for the installation of enterprises, given the environmental restrictions, apparently show greater interference on the proceeding period.So, there is a necessity, prior to licensing, of being drawn up specific studies focused on the presentation of located alternatives to consider environmental and economic issues with the same level of importance for the decision.Such studies, serving as point of reference for choosing the best location for setting up of enterprises tend to reduce the proceeding period of the licensing processes
Business · Economics · Environmental economics · Environmental impact assessment · Environmental resource management · Operations research · Political science · Welfare economics · Engineering · Environmental Science · Extraction and Separation Processes · Recycling and Waste Management Techniques