Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

From least-cost plans to implementable electrification

A regulatory–financial framework to achieve universal access

Bibliographic Data

ID21595661
AuthorsSantos J Díaz-Pastor (0009-0008-9266-3077, Massachusetts Institute of Technology, corresponding author), Carlos de Abajo, Robert Stoner (Massachusetts Institute of Technology), Ignacio J Pérez-Arriaga (Massachusetts Institute of Technology)
Year2026
Volume101
Pages102221
Publication date2026-08-01
Open AccessYes
TypeARTICLE
VenueUtilities Policy (JOURNAL)
Journal identifiersISSN: 0957-1787 • E-ISSN: 1878-4356
PublisherElsevier BV (PUBLISHER)
DOI10.1016/j.jup.2026.102221
OpenAlexW7161167238
LanguageEN
References cited27

Achieving universal electricity access requires more than a least-cost electrification plan. In many low- and middle-income power sectors, affordability constraints, distressed distribution utilities, and high perceived risk prevent least-cost pathways from being implemented by raising the cost of capital. This paper develops an integrated regulatory–financial framework that completes least-cost planning by linking: (i) techno-economic analysis across grid and off-grid options; (ii) implementable business models under cost-of-service regulation; and (iii) a financing architecture that coordinates public resources, concessional instruments, and commercial capital through a centralized platform that pools and ring-fences flows and disbursement rules. The results separate two implementation constraints. The first is the “viability gap”, the shortfall between realized cash revenues and the regulated cost of service when affordability and weak retail performance prevent full annual recovery. The second is “financing needs”, which arise because electrification requires large upfront investment, while cost recovery occurs gradually, even when the plan is viable in the long run. The framework clarifies the policy levers: viability gaps require explicit and predictable compensation mechanisms, while financing needs require capital structures, tenors, and liquidity facilities aligned with the regulatory recovery schedule and allowed returns sufficient to cover financing costs and preserve equity value. The approach provides a transferable methodology for regulators and policymakers to move from least-cost targets to implementable electrification programs with revenue adequacy and financeable cash-flow trajectories. It is illustrated with applications in Rwanda and Uganda, showing how the same logic can be parameterized across institutional forms to support universal access

Universal design · Electric Vehicles and Infrastructure · Energy and Environment Impacts · Smart Grid Energy Management

  • Understanding structural, governance and regulatory incentives for improved utility performance

    Open Access•Peter Twesigye•Energy Research & Social Science•2022

  • Developing countries experience and outlook

    Open Access•Ian Alexander•Utilities Policy•2014

  • Funding and Financing Infrastructure

    Open Access•Marianne Fay, David Martimort et al.•Journal of Development Economics•2018

  • Experimental Evidence on the Economics of Rural Electrification

    Kenneth Lee, Edward Miguel et al.•Journal of Political Economy•2019

  • Mini-grids and private investment in rural electrification

    Open Access•Timothy Olaniyi Aluko, Nonjabulo C Ngcobo et al.•Utilities Policy•2025

Highly citedNo

Tools

Open DOIOpen Access
Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae