Skip to main content

ETHNOS_APP

Home • Search • Journals • List 0

The application of spatial data processing to land use conflict resolution in the lal lal water catchment of the Ballarat growth corridor

A case study from chapter one of the Buninyong planning scheme

Bibliographic Data

ID8382134
AuthorsI A Allan, Ian Allan (0000-0002-0257-1646, Monash University, corresponding author), James A Peterson (0000-0003-0177-8255, Monash University)
Year1993
Volume24
Issue2
Pages76-88
Publication date1993-11-01
Open AccessNo
TypeARTICLE
VenueAustralian Geographer (JOURNAL)
Journal identifiersISSN: 0004-9182 • E-ISSN: 1465-3311
PublisherInforma UK Limited (PUBLISHER • GB)
DOI10.1080/00049189308703091
OpenAlexW2073076514
LanguageEN
Citations received1
References cited2

Land use conflict within the Lal Lal Water Catchment is between landowners, the Shire, the Water Board and those directing regional pressures for development. It is exacerbated by inconsistency in building permit appraisal outcomes. The deliberations involved would clearly have benefited from access to spatial data sets through use of a Geographical Information System (GIS) during applications appraisal, in that inconsistencies are most obvious when mapped in relation to the criteria applied. GIS methodologies would ensure that information of a high standard was produced. Three strategic points are identified for the implementation of GIS: at the planning scheme formulation stage; the permit application stage; and the formal conflict resolution stage. Reference to GIS at the first two stages presupposes the existence of a local government area (LGA) spatial data base and a GIS/LIS that can output overlay maps. Application of GIS at the third stage is somewhat ‘after the event’. This study suggests that without such a regional review of the spatial patterns of permit appraisal criteria (including overland flow modelling) each appeal or negotiation is likely to yield an outcome that is inconsistent in relation to other cases. An LGA planning office maintaining a GIS with all layers relating to these criteria will have assembled its spatial data according to the requirements of its planning scheme and will make most use of it in a GIS at the permit appraisal stage. KEY WORDS: Land use conflict resolutionplanning schemesGeographic Information Systemsbuilding permit appraisalwater catchment protectionstream buffers

Cartography · Civil engineering · Data mining · Environmental planning · Environmental resource management · Geographic information system · Geography · Information system · Land use · Negotiation · Operations research · Regional planning · Relation (database · Remote sensing · Spatial analysis · Spatial data infrastructure · Spatial planning · Urban planning · Computer Science · Engineering · Environmental Science · Geographic Information Systems Studies · Land Rights and Reforms · Soil erosion and sediment transport

  • Spatial Modelling in Decision Support for Land‐Use Planning

    Open Access•Ian Allan, Jim Peterson•Australian Geographical Studies•2002

Citations per year0.04
Citation span2002 - 2002 (1)
Highly citedNo

Tools

Open DOISci-Hub
Ethnos_APP • Open Source Project • MIT License • Frontend v2.0.0 • Privacy and Cookies • API Documentation: api.ethnos.app/docs • API Source Code: GitHub • DOI: 10.5281/zenodo.17049435 • Frontend Source Code: GitHub • DOI: 10.5281/zenodo.17050053 • cruz.rio.br • Expectantes Misericordiae